2、处理好道路与农业,农村,农民的关系,注意与农业基本建设的配合,做到少占田地并尽量不占高产田地和经济作物田地,避免穿越经济林园,并注意
2、 处理好道路与农业,农村,农民的关系,注意与农业基本建设的配合,做到少占田地并尽量不占高产田地和经济作物田地,避免穿越经济林园,并注意与修路造田,农田水利设施,土地规划相结合;
3、 充分重视水文地质条件和问题,不良地质地貌对道路的稳定性影响有多大,同时对特殊地质的处理的工程费用非常大,这将极大地增加工程成本和造价。对于滑坡、崩塌、岩堆、泥石流岩溶、沼泽等严重的工程地质水文问题应慎重地处理,一般情况下应尽量避绕,必须穿越时应选择合理的位置缩小穿越范围,并采取相应的处理措施;
4、 重视环境保护和生态保护,加强环境保护工作,重视生态平衡,为人类创造良好的生活环境,是我国的一项基本国策。
七、主要内容
设计的最初,在定线时选择了三条路线,由于设计范围的地势较陡,处于山丘沿溪区选择了较为平坦的路线,但由于穿过建筑区域,沿溪过多,不利于施工和经济效益,最终经反复思考,定出了较合适的路线。
本次道路设计中,依次进行平、纵、横线形设计,平面选线,纵断面拉坡,横断面成图,在道路中线经过河流湖泊,原道路的地方设置涵洞桥梁。之后进行计算书的编写,计算平面线形,竖曲线,挡土墙稳定性,边坡稳定性,涵洞盖板钢筋计算以及概预算。
关键词: 道路设计;平纵横线形设计;挡土墙计算;盖板配筋计算;概预算
Design Of Secondary Road Of WuXi
Design General Information:
I. the source of the task
According to the requirements of the graduation design task book, according to the topographic map selection, alignment, and then design the road's plane, cross-section and profile; focus on solving the "flat package vertical" and other issues. And can carry on the pavement structure design, to the asphalt concrete pavement, can design its structure picture, for the cement concrete pavement, can design its structure, and can design the plate plane size, the joint form and the structure picture. We must also be able to budget the entire route.
II. the design basis
1. 《Road Survey and Design 》Zhang Jinshui Editor Tongji University Press
2. 《Road Subgrade and Pavement Engineering》 Yao Zukang, Tongji University Press
3. 《Traffic Engineering Handbook》 People's Communication Press
4. 《Highway Engineering Technical Standards》 People's Communication Press
5. 《Road Route Design Specification》 People's Communication Press
6. 《Highway Asphalt Pavement Design Code》 People's Communication Press
7. 《Code for Design of Highway Cement Concrete Pavement"》People's Communication Press
8. 《Urban Road Design Code》 China Building Industry Press
9. Civil Engineering Graduation Design Guide 《Road Works》, edited by Xu Jiaxuan et al.
10.《Road Construction Organization and Budget》, Deng Renqing People's Communication Press
11.《Engineering Budget Estimate Manual》 Shen Qiming People's Communication Press
III. technical standards
1. Road grade: Grade 2 highway
2, the number of lanes: two lanes
3, the road width is: 3.5m × 2 = 7m
4, shoulder width: 0.75m +0.75m = 1.5m
5, road arch slope: 2%
IV. Overview of natural geography
(1) The Wuxi Line Highway is located in Luoyang City. The main geomorphological unit that the route passes through is the loess hilly region. The elevation is 200-500 meters, and the relative height difference is 50-150 meters. The valley is developed and the terrain is undulating and very complicated.
(2) The topography of the road section is the piedmont hill area. The starting point of the design section A is K0+000. According to the analysis of drilling identification, on-site static penetration test, standard penetration test results, and indoor soil test results, the basic distribution of the soil layer in the design section was: mainly reddish-brown, yellow-brown silty clay, and locally weak plastic. It forms calcareous slate.